Home TürkçeTr EnglishEn English English English
optimum network solutions
References

Siteyi ziyaret etmek için lütfen tıklayın Project Owner Turkcell
Scope Turkcell Benchmark & Hotspot Project
Content - 2G Network Benchmark Project
- 2G Hotspot Analysis
- 3G Network Cluster erification Project
- Samsun Region 14 cities BM
- 7 cities Hotspot
- Major Roads and Railways
- Comparing the 3 operators
- GSM
- GPRS-EDGE
- 3G
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Huawei
Scope Turkcell 2G & 3G
Content - Turkey East Region
- Single Site verification Tests, 3G
- Single Site verification and Function Tests, 2G
- Cluster Acceptance and Optimization, 3G
- 2G Swap and Cluster Acceptance (Erzurum)
- UMTS Performance
- HSPA Performance
Siteyi ziyaret etmek için lütfen tıklayın Project Owner MSI
Scope Avea 3G Optimization Project
Content - 3G Optimization Project
- 9 cities
- Hotspot
- Benchmark
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Nokia Siemens Networks
Scope Bakcell Optimization Project
Content - 2G Network Swap & Optimization Project
- Greater Baku Area with 500 Swap Sites
- KPI Harmonization and Formula Mapping
- Parameter Mapping (Siemens s Nokia)
- New Frequency Planning
- Cluster Acceptance based on Pre/Post Targets
- GPRS and EDGE Testing
- Benchmarking Against Competitors
- New Features Trials in Nokia S-13 BSS
- DT and Network KPI Analysis
- Identifying HW, TXN and Core Issues
- Maintaining QOS during Swap
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Huawei
Scope Eagle Mobile Optimization Project
Content - 2G Network Optimization Project
- All of Albania
- 900 and 1800 network
- Transmission
- Optimization
- Site Surveys
- Benchmarking
- GPRS-EDGE Tests
- Drive Tests & Analysis
- Statistical Analysis
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Huawei
Scope Turkcell Installation Project Diyarbakır
Content - 2G New Site TI Installation (73 sites)
- 3G Colocated Site TI Installation (24 sites)
Siteyi ziyaret etmek için lütfen tıklayın Project Owner ZTE
Scope Avea 3G Installation Project
Content - Surveillance support in Istanbul 5 personnel
- FLM support 3 personnel
- BTK file preparation
- As Built file preparation
- TSS file preparation
- PHASE 1 3G Installation 98 sites
- PHASE 2 3G Installation 69 sites
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Huawei
Scope Huawei-Turkcell 2G Swap Project
Content - Started Feb 2008 – Ended Feb 2009
- Around 1100 2G sites
- Turkey Trabzon Region
- Single Site erification Tests, 2G
- Single Site erification and Function Tests, 2G
- Cluster Acceptance and Optimization, 2G
- GPRS Performance
- EDGE Performance
Siteyi ziyaret etmek için lütfen tıklayın Project Owner Motorola
Scope Vodafone Turkey Roll-out and Optimization Project
Content

- Started Feb 2007 – Ended August 2009
- 2G Network Rollout, Transmission and Optimization Project
- Turkey wide
- Nominal Plan
- Site Surveys
- RF Planning
- Transmission (Microwave) Planning and Optimization
- RF Optimization and Cluster Acceptance
- 3000 New Site planned
- 5000 sites Swapped
- Benchmark
- GPRS Performance
- 35 Clusters Reviewed
- 12 Analysis Engineers
- 20 DT Engineers and 12 DT Technicians
- Total 120 personnel

Siteyi ziyaret etmek için lütfen tıklayın Project Owner Huawei
Scope Eagle Mobile Roll-out Project
Content

- Started Nov 2007 – Ended Feb 2008
- 2G Network Roll-out Project
- All of Albania
- 900 and 1800 network
- Nominal Plan
- Site Surveys
- TSS
- Transmission
- Initial Tuning
- 350 sites

Siteyi ziyaret etmek için lütfen tıklayın Project Owner KKTCELL
Scope TRNC KKTCell Optimization Project
Content

- Started Nov 2006 – Ended Nov 2008
- 2G Network Optimization Project
- Statistical Analysis
- Parametric Analysis
- Frequency Planning
- Troubleshooting

Siteyi ziyaret etmek için lütfen tıklayın Project Owner Life :) Belarus
Scope Life :) Benchmark Project
Content

- Started Nov 2008 – Ended Feb 2009
- Benchmarking three operators
- Minsk City Area
- 2 DT Engineers
- 2 Analysis Engineers
- Fault Analysis and Recommendations

Siteyi ziyaret etmek için lütfen tıklayın Project Owner MTS
Scope MTS Kiev City Optimization Project
Content

- Started Jun 2007– Ended Sep 2008
- 2G Network Optimization Project
- Kiev City Area
- 900 and 1800 network
- Troubleshooting
- Detailed Analysis
- Frequency Planning
- 3 Analysis Engineers
- 3 DT Engineers

ONS Inc.'s engineers were engaged in numerous projects over 4 different continents with well-known operators and vendors since 2004. For instance, Motorola, Nokia, Siemens, Nortel, operators, like Turkcell, Avea, Vodafone, T-Mobile and consultancy companies like Aircom International, Aircom, MSI etc. for many years.

24 hours support. We are waiting for your calls
Referanslarımız

© 2009 All rights reserved. Optimum Network Solutions